Tri Tool 620SB Clamshell Air User Manual

Page 10

Advertising
background image

10

TRI TOOL INC.

92-0220 : Rev. 131230

After every 40 hours of actual operation:

Thoroughly clean and lubricate Main Gear, Drive Gear, male and female Tool

Slides, Feed Screws, and Tripper Block Assy.

Non-scheduled maintenance:

Readjust the Main Bearing pre-load if the Clamshell generates excessive

heat or if the Main Bearing becomes loose. Refer to Adjustment of the Main

Bearing

pre-load.

Thoroughly clean and check the Tool Blocks in the event of feed problems.

STORAGE

If the Clamshell is to be stored or if it will remain out of service for a significant

period of time (30 days or more), it should be thoroughly cleaned lubricated and

sprayed with a rust preventative prior to storage.

Remove the airline Quick Disconnect and spray it with a lightweight oil.

Squirt oil into the male Quick Disconnect.

Reconnect the airline and turn on the Air Motor for 1 or 2 seconds to disperse oil

throughout the vanes and rotor.

ADJUSTMENT OF THE MAIN BEARING PRE-LOAD

Loosen all Bearing Adjustment Lock Screws about 1/2 turn (1 through 24).

Turn in Bearing Adjustment Screws (1, 5, 9, 13, 17, and 21) so that they are

snugged tightly.

This insures that the Bearings are fully pushed forward. Refer to the Bearing

Adjustment Screw locations.

Lightly turn in the remaining Bearing Adjustment Screws in the order shown until all

of the Bearings make contact with the Headstock.

Relax Bearing Adjustment Screws (1, 5, 9, 13, 17, and 21) and resnug them so that

all of the Bearing Adjustment Screws are evenly loaded against the Bearings.

Connect the air supply and apply power to the Clamshell so that it is running at full

speed.