Vantage Point VPAGG409 User Manual

Important : please read first, Step 1 step 2 step 3 step 4, Vantage point products corp

Advertising
background image

Vantage Point Products Corp.

P.O. Box 2485, Santa Fe Springs, CA 90670

U.S.A. Tel: 800-582-9595 • Canada Tel: 905.607.9994 • Web Site: www.vanptc.com • Email: [email protected]

WARRANTY INFORMATION

No Warranty on Glass. All Vantage Point products are
manufactured to ensure superior quality, performance
and durability for a lifetime of use. Warranty covers the
product to be free from defects in materials and work-
manship under normal and reasonable use. Vantage
Point Products Corp. will repair or replace, at our
option, any product which proves to be defective upon
our inspection. This warranty will not apply to products
that have been lost or damaged by misuse, abuse or
accident, altered or repaired in any way or by any
person or firm other than specified by us, used in
violation of instructions or incorrect assembly nor used
in a manner other than specified by us. The warranty is
nontransferable to a new owner and may require proof
of purchase. All claims must be directly handled
with Vantage Point Products Corp.

Maximum Weight Ratings

3 Shelf Glass 250 lbs
4 Shelf Glass 125 lbs
5 Shelf Glass 125 lbs

IMPORTANT : PLEASE READ FIRST

Steps for the Three, Four and Five shelf Audio/Video stand are the same. It is advisable to perform assembly
on a clean flat surface . The unit must be assembled up-side down and then carefully turned over after
completing step 4. Should any portion of these instructions be unclear, call our customer service at
800-582-9595

A Foot

cone

6

B

Spikes

6

C

Jam nuts for spikes

6

D Threaded

rod

22.275” 6

E 2-3/4”

tubes

6

F Plastic

spacers

30

G 9”

tubes

12

H Glass

shelves

3

I Buttons

6

A Foot

cone

4

B

Spikes

4

C

Jam nuts for spikes

4

D Threaded

rod

31.605” 4

E 2-3/4”

t

ubes 4

F Plastic

spacers

28

G 9”

tubes

12

H Glass

shelves

4

I Buttons

4

A Foot

cone

4

B

Spikes

4

C

Jam nuts for spikes

4

D Threaded

rod

30.935” 4

E 2-3/4”

t

ubes 4

F Plastic

spacers

36

G 6-1/2”

tubes

16

H Glass

shelves

5

I Buttons

4

3 SHELF

4 SHELF

5 SHELF

I

(inverted for assembly)

(inverted for

assembly)

(inverted for

assembly)

G

D

F

A

D

I

G

F

I

G

F

D

Step 1

Step 2

Step 3

Step 4

After placing the last glass shelf
(H) on top, install the plastic spac-
ers (F) small hole down. Locate
the 2-3/4” tubes (E) and install
one onto each threaded rod (D).
Screw the foot cones (A) down
onto the exposed threaded rods
(D). Tighten the cones (A) by
rotating the 2-3/4” tubes and the
foot cones together. Note: Make
sure all plastic spacers are prop-
erly engaged in both shelves and
tubes before final tightening. Install
optional rubber tips or spikes w/
jam nuts. Turn unit upright.

Install the next glass shelf(H) care-
fully over the threaded rods (D).
Align on the previously installed

plastic spacers (F). Slide one plas-
tic spacer (F) down each threaded
rod (D) small hole down. Align
the plastic spacers (F) into the
holes on the glass shelf (H). Slide
one long tube (G) down each of
the threaded rods (D) and align
on the plastic spacers (F). Again
slide a plastic spacer (F) down
each threaded rod (D) small hole
up, engage into the long tubes
(G). Repeat this procedure for the
remaining shelves.

Once all of the threaded rods
(D) are installed, slide the plastic
spacers (F) onto the threaded
rods (D). Make sure the small
hole end with the lip is facing
downward, this lip will engage into
the hole in the glass shelf (H). The
large diameter end will engage
into the tubes. Next slide one each
of the long tubes (G) down each of
the steel rods (D). Tubes should
engage onto the plastic spacers
(F). Again slide one plastic spacer
(F) down each threaded rod (D)
with small hole up.

Locate the glass shelf (H), then
position the threaded button (I)
hole face up, under the glass
shelf (H) and align with the holes
in the glass shelf (H). Install the
threaded rods (D) into the the
threaded buttons (I). Note: Do not
over tighten.

Optional Spikes included
for carpeted floors.

Three, Four and Five Shelf

Glass Rack Assembly Instructions

I

H

D

D

H

H

D

F

G

F

G

E

A

E

H

A

E

H

H

E

A

6i17-02/07

C

B

Advertising