Installation, Safety summary, Unpacking and inspection – Verilink PRISM 4051 (34-00253.2) Product Manual User Manual

Page 11: Supplied materials, Mounting, Nstallation

Advertising
background image

2

I

NSTALLATION

This chapter contains information and instructions required to prepare the Verilink
PRISM 4051 for use. This chapter includes initial inspection procedures, mounting
instructions, configuration guidelines, connection instructions, and powering
information.

Safety Summary

This manual contains information and warnings which must be followed by the
user to ensure safe operation and to retain the equipment in a safe condition.

This WARNING sign denotes a potential hazard to the operator. It calls attention to a
procedure or practice which, if not correctly performed or adhered to, could result in

injury or loss of life. Do not proceed beyond a WARNING sign until the indicated conditions
are fully understood and met.

Follow proper ESD (electrostatic discharge) procedures while handling the circuit
boards.

Unpacking and
Inspection

Upon receipt of shipment, inspect the shipping container and contents. If the
contents of the shipment are incomplete or, if there is mechanical damage or
defect, notify Verilink Customer Service. If the shipping container or cushioning
material is damaged, notify the carrier and Verilink immediately and make a
notation on the delivery receipt that the container was damaged (if possible, obtain
the signature and name of the person making delivery). Retain the packaging
material until the contents of the shipment have been checked for completeness
and the instrument has been checked both mechanically and electrically.

Supplied
Materials

The PRISM 4051 shipment contains four items.

• PRISM 4051 unit

• T1 to DDS adapter (part number 9-1001-075-1)

• Network Interface Cable (part number 9-1544-619)

• Reference manual with configuration guide

Mounting

The Verilink 4051 DDS CSU/DSU is a modular unit that plugs into a Verilink
1051 chassis which holds up to 12 units.

The chassis can be installed in either a 19- or 23-inch rack using four screws.
Connections are made from the rear panel of the chassis.

Advertising