Hydraulic lift vertical mast operation, Safety warning – Allmand Brothers MLEX20-30KW V User Manual

Page 9

Advertising
background image

88

9

HYDRAULIC LIFT VERTICAL MAST OPERATION

VISUALLY INSPECT EQUIPMENT FOR

DAMAGE BEFORE OPERATING. ALLOW

ADEQUATE CLEARANCE AROUND TRAIL-

ER FOR TOWER AND INSURE THAT NO

PERSONS ARE STANDING IN UNDER THE

LIGHTS WHEN LOWERING.

TO LOWER TOWER AND LIGHTS

1. Turn off lights.

2. Operate the hydraulic lift switch in the down

position to lower the lights to the lowest

vertical position. When tower reaches

the bottom, run switch for three additional

seconds to ensure that the tower is at it’s

lowest possible position.

3. Stop engine.

4. Rotate the light bar into the transport park

position (in line with trailer) and engage the

park pin by twisting on the park pin ring until

the plunger is released and the pin engages

the hole in the light bar.

SAFETY WARNING!

6. Operate the hydraulic lift switch to the

“up” position to raise tower to the de-

sired height.

7. If lights need to be adjusted for better

lighting of the work zone after raising the

tower, lower the tower using the “down”

switch position and make desired adjust-

ments to the light bar and light fixtures.

Raise the tower into position. Repeat

this step if necessary.

NOTE: Ensure the detent pins are prop-

erly engaged in the outriggers before

towing.

5. Reposition the lamp fixtures for transport

by pulling them down into the lowest posi-

tion and face the fixtures toward the center

of the trailer.

6. Remove ground rod from earth. Discon-

nect wire from ground lug and secure in

trailer

7. Raise jacks and rear stand, retract outrig-

gers and secure for towing

Advertising