3 cycles for drilling, tapping and thread milling, Overview – HEIDENHAIN iTNC 530 (340 49x-03) ISO programming User Manual

Page 292

Advertising
background image

292

8 Programming: Cycles

8.3 Cy

cles f

o

r Dr

illing,

T

a

pping and Thr

ead Milling

8.3 Cycles for Drilling, Tapping and

Thread Milling

Overview

The TNC offers 16 cycles for all types of drilling operations:

Cycle

Soft key

Page

G240 CENTERING
With automatic pre-positioning, 2nd set-
up clearance, optional entry of the
centering diameter or centering depth

Page 294

G200 DRILLING
With automatic pre-positioning, 2nd set-
up clearance

Page 296

G201 REAMING
With automatic pre-positioning, 2nd set-
up clearance

Page 298

G202 BORING
With automatic pre-positioning, 2nd set-
up clearance

Page 300

G203 UNIVERSAL DRILLING
With automatic pre-positioning, 2nd set-
up clearance, chip breaking, and
decrementing

Page 302

G204 BACK BORING
With automatic pre-positioning, 2nd set-
up clearance

Page 304

G205 UNIVERSAL PECKING
With automatic pre-positioning, 2nd set-
up clearance, chip breaking, and
advanced stop distance

Page 306

G208 BORE MILLING
With automatic pre-positioning, 2nd set-
up clearance

Page 309

G206 TAPPING NEW
With a floating tap holder, with automatic
pre-positioning, 2nd set-up clearance

Page 311

G207 RIGID TAPPING NEW
Without a floating tap holder, with
automatic pre-positioning, 2nd set-up
clearance

Page 313

G209 TAPPING W/ CHIP BRKG
Without a floating tap holder, with
automatic pre-positioning, 2nd set-up
clearance, chip breaking

Page 315

Advertising