Cycle run – HEIDENHAIN TNC 640 (34059x-02) Cycle programming User Manual

Page 101

Advertising
background image

TAPPING NEW with a floating tap holder (Cycle 206, DIN/ISO:

G206)

4.2

4

TNC 640 | User's Manual Cycle Programming | 5/2013

101

4.2

TAPPING NEW with a floating tap
holder (Cycle 206, DIN/ISO: G206)

Cycle run

1 The TNC positions the tool in the tool axis at rapid traverse

FMAX to the entered set-up clearance above the workpiece
surface.

2 The tool drills to the total hole depth in one movement.

3 Once the tool has reached the total hole depth, the direction of

spindle rotation is reversed and the tool is retracted to the set-
up clearance at the end of the dwell time. If programmed, the
tool moves to the 2nd set-up clearance at

FMAX.

4 At the set-up clearance, the direction of spindle rotation

reverses once again.

Advertising