Cycle run – HEIDENHAIN TNC 640 (34059x-04) Cycle programming User Manual
Page 103
Advertising

TAPPING with a floating tap holder (Cycle 206, DIN/ISO: G206)
4.2
4
TNC 640 | User's Manual Cycle Programming | 3/2014
103
4.2
TAPPING with a floating tap holder
(Cycle 206, DIN/ISO: G206)
Cycle run
1 The TNC positions the tool in the tool axis at rapid traverse
FMAX to the entered set-up clearance above the workpiece
surface.
2 The tool drills to the total hole depth in one movement.
3 Once the tool has reached the total hole depth, the direction of
spindle rotation is reversed and the tool is retracted to the set-
up clearance at the end of the dwell time. If programmed, the
tool moves to the 2nd set-up clearance at
FMAX.
4 At the set-up clearance, the direction of spindle rotation
reverses once again.
Advertising