6.8 Plan System Monitoring (Optional)

Specifications area

1. Depending on the requirements that you have of the PV system monitoring, activate the required checkboxes:

Requirement

Explanation

Optimizing self-consumption

You wish to obtain action recommendations for manual switching of loads in

order to make optimal use of own PV energy on site (self-consumption).

Analysis of consumption and

management of loads

You wish to obtain an analysis of your consumption. You also wish to have

automatic intelligent switching of loads in order to make optimal use of own

PV energy on site.

PV system monitoring via the

Internet and visualization of

PV system data

You wish to monitor the PV system via the Internet and visualize the PV system

data in the Internet.

Online archiving

You wish to archive the PV system data in the Internet.

Remote diagnosis

Yo wish to analyze PV system faults via the Internet.

Visualization of PV system data

on site

You wish to view the PV system data on site.

Plant maintenance and

parameterization on site

You wish to enable maintenance and parameterization of the PV system on site.

Storage of PV system data on

site

You wish to store the PV system data on site.

Connecting external sensors

You wish to connect sensors from third-party manufacturers to the PV system

(e.g. wind sensor, ambient temperature sensor)

Measuring global radiation

You wish to measure the global radiation.

Reading out energy meters

You wish to read out the data of the feed-in meter, the PV production meter and

the purchased electricity meter.

Feed-in management

You wish to or must participate in feed-in management with the PV system. In

accordance with the Renewable Energy Sources Act (EEG) 2012, PV system

operators with installed power of 30 kW to 100 kW must participate in feed-in

management (variable active power limitation). PV system operators with

installed power less than 30 kW have a choice: they can participate in feed-in

management or they can limit the active power of their PV system to 70 % (fixed

active power limitation).

Control of large-scale PV power

plants

You wish to control and regulate your large-scale PV power plant (connection

to a SCADA system).

Wireless data transmission

You would like to wirelessly call-up the PV system data.

Notification in case of

disturbances

You wish to be notified if disturbances occur in the PV system.

Advertising
This manual is related to the following products: