SMA SUNNY DESIGN 3 User Manual

Page 22

Advertising
background image

6  Operation

SMA Solar Technology AG

22

SD3-SDW-BA-en-20

User Manual

2. Depending on the requirements on your PV system, activate the required checkboxes:

Design Area

In this area, you select the communication products for PV system monitoring.

1. In order to only use current (not discontinued) communication products in the design, activate the checkbox

Only take current communication products into account.

2. You have the following options for selecting the communication products:

• To have the communication products selected automatically, select [Automatic design].
• To select communication products from proposals, select [Design alternatives] and then select [Adopt design]

in the the column of the required design alternative.

• To select a specific communication product for PV system monitoring, select [Add communication product].

If you have activated the checkbox Only take current communication products into account, you can only

select current communication products in the list.

3. To remove all added communication products from the Result area, select [Delete system monitoring].

Result Area

In this area, you obtain an overview of the internal and external communication products used in the project and the type

of data transmission.

• If a communication product is to be included in the design alternatives, select the lock symbol next to the

communication product. The lock symbol is displayed closed. To undo the setting, select the lock symbol again.

• To delete a communication product, select [X] next to the communication product.

Next Steps Area

Requirements

Explanation

Internet access is available

The PV system can be connected to the Internet.

Own operation control system is

available

A control room (SCADA system) is available.

S0 meter interface is available

An S0 meter interface is available in the PV system.

D0 meter interface is available

A D0 meter interface is available in the PV system.

Project type

Next steps

PV system

• Select [Efficiency analysis].

☑ The page Efficiency analysis opens (see Section 6.9.1, page 23).

PV system with self-consumption

Advertising
This manual is related to the following products: