4 requirements for the installation, 1 requirements: mounting place, Requirements for the installation – SMA SB 3300TL Installation User Manual

Page 13: Requirements: mounting place

Advertising
background image

SMA

Technologie AG

Requirements for the Installation

Installation Guide

SB3300TL-11:SE2006

Page 13

4 Requirements for the Installation

Please make sure to fulfill all conditions below before installing and commissioning
the Sunny Boy 3300TL.

4.1 Requirements: Mounting Place

The Sunny Boy 3300TL has a weight of 28 kg. Please keep this in
mind when selecting the place where and how to mount the Sunny
Boy 3300TL.

The Sunny Boy 3300TL should be installed at a place where it is not
exposed to direct sunlight - otherwise this may reduce the yield of the
PV plant due to the higher temperature.

The Sunny Boy is designed to be mounted on a vertical wall. For an optimum energy
yield and the most convenient operation, vertical installation at eye-level is
preferable. In case it is absolutely necessary to tilt the Sunny Boy to the back the
maximum angle is 45 °. If installing the unit outdoors, make sure that it is not slanting
forwards.

It is not reccomended to install the Sunny Boy lying on the back side with the lid facing
upwards.

The ambient temperature must be within -25 °C and +60 °C.

28 kg

Mount the Sunny Boy in a vertical position

or with a slight angle to the back.

Do not mount the Sunny Boy with an angle

to the front or on the back.

Advertising