Magnum Energy Mini Magnum Panel (MMP Series) User Manual

Page 34

Advertising
background image

Page 25

©

2013 Magnum Energy, Inc.

Installation

GROUND BUSBAR (inverter’s
input and output AC ground)

AC - GROUND CONNECTION
(remove green wire from ground
busbar if neutral is bonded to
ground from primary source)

GROUND BUSBAR
(from utility/generator ground
and to AC load panel ground)

INV NEUTRAL IN

(to inverter’s AC neutral input)

INV HOT 1 OUT

(from inverter’s

AC Hot 1 output)

INV HOT 2 OUT

(from inverter’s

AC Hot 2 output)

INV HOT 1 IN

(to inverter’s AC Hot 1 input)

INV HOT 2 IN

(to inverter’s AC Hot 2 input)

INV NEUTRAL OUT

(from inverter’s AC

neutral output)

AC NEUTRAL IN

(from neutral of utility or generator)

AC HOT 1 OUT

(to main breaker on

L1 side in AC load panel)

AC HOT 2 OUT

(to main breaker on

L2 side in AC load panel)

AC HOT 1 IN

(from L1 side of utility or generator)

AC HOT 2 IN

(from L2 side of utility or generator)

AC NEUTRAL OUTPUT

(to neutral busbar in

AC load panel)

Figure 2-10, AC Wiring Connections (MMPxxx-30D Models)

Advertising