6. sequence of gouging operation – Hobart Welding Products AirForce 625 And ICE-40C Torch User Manual

Page 24

Advertising
background image

OM-926 Page 20

801 400-B

5-6. Sequence Of Gouging Operation

Raise trigger lock and press trigger. Pilot

arc starts. Move tip to within approxi-

mately 3/16 in (4.8 mm). Start gouging

across workpiece surface. Maintain

approximately a 45

°

angle to surface.

Release trigger. Postflow continues for

approx. 20 seconds after releasing trigger;

arc can be instantly restarted during postflow

by raising trigger lock and pressing trigger.

The pilot arc starts immediately

when trigger is pressed.

Hold torch at approximately

45

°

angle to workpiece.

Connect work clamp to a clean, paint-free

location on workpiece, as close to cutting

area as possible.

.

Set air pressure to 55 PSI (379 kPa) for gouging.

455

Advertising