Installation 13

Selecting a site

WARNING: To prevent fire or electric shock, install the unit in a temperature- and

humidity-controlled indoor environment, free of conductive contaminants.

When selecting a site, consider the following factors:

Elevated operating ambient temperature—If the equipment is installed in a closed or multi-unit rack

assembly, the operating ambient temperature of the rack environment might be greater than room

ambient temperature. Install the equipment in an environment compatible with the operating

temperature ("

Environmental specifications

" on page

47

).

Reduced air flow—In the rack, the rate of air flow required for safe operation of the equipment must

not be compromised.

Circuit overloading—Consideration should be given to the connection of the equipment to the supply

circuit and the effect that overloading of the circuits might have on overcurrent protection and supply

wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing

this concern.

Reliable earthing—Reliable earthing of rack-mounted equipment should be maintained. Particular

attention should be given to supply connections other than direct connections to the branch circuit,

such as the use of power strips.

Electrical requirements—All models require a dedicated (unshared) branch circuit, suitably rated for

the specific UPS as stated in "Input specifications ("

UPS input specifications

" on page

45

)" .

Readying the equipment

1.

Check the battery recharge date specified on the label that is affixed to the shipping carton.

IMPORTANT: Do not use the battery if the recharge date has passed. If the date on the battery recharge

date label has passed without the battery being recharged, contact an HP authorized service representative
for directions.

2.

Transport the packaged unit to its installation location.

3.

Unpack the equipment near the rack where the unit will be assembled.

CAUTION: Always plan the rack installation so that the heaviest item is on the bottom of the rack. Install

the heaviest item first, and continue to populate the rack from the bottom to the top.

Installing the UPS as a tower

Before installing the unit, review and adhere to all warnings provided in "Precautions (on page