Installation instructions, Site requirements, Gas supply – Stovax PR0741 User Manual

Page 15: Ventilation

Advertising
background image

15

INSTALLATION INSTRUCTIONS

SITE REQUIREMENTS

2.5 Ensure that no naked flame or incandescent part of the fire

bed projects beyond the vertical plane of the fireplace

opening.

2.6 The fire must not be installed in any room that

contains a bath or shower.

2.7 Ensure clearances to combustible materials - see diagram 3.

3

Dimensions given

are to the frame

of the fire.

AR0707

2.8 The maximum depth of combustible shelf is 150mm at a

minimum height of 150mm above the frame.

Refer to the appropriate Frame Instructions regarding

additional wall strengthening for the frame.

3. GAS SUPPLy

3.1 Before installation, ensure that the local distribution

conditions (identification of gas and pressure) and the

adjustment of the fire are compatible.

3.2 Ensure that the gas supply is capable of delivering the

required amount of gas, and is in accordance with the rules

in force.

3.3 This fire is supplied complete with a factory fitted isolation

device incorporated into the inlet connection, no further

isolation device is therefore required.

4. vENTILATION

It is important to ensure that any national ventilation

requirements are taken into account during the installation of

this fire.

4.1 This fire has a nominal input not exceeding 7.0kw
and therefore does not normally require any additional
permanent ventilation.

If, however, spillage is detected when commissioning the fire,

there may be insufficient natural ventilation and additional

ventilation may be required.
For ventilation requirements in the Republic of Ireland, it will be

necessary to refer to the relevant rules in force.

AIR vENTS MUST NOT BE RESTRICTED.

Advertising