Installation instructions, Installation / commissioning, Lighting the fire – Stovax PR0741 User Manual

Page 23: Commissioning

Advertising
background image

23

INSTALLATION INSTRUCTIONS

INSTALLATION / COMMISSIONING

10. LIGhTING ThE FIRE

10.1 Locate the control valve on the fire. There are two

control knobs on the valve, the right-hand knob controls the

pilot ignition and the left hand knob controls the main

burner.

10.2 If your fire has already been upgraded to battery remote

control, please refer to the instructions provided with the

upgrade to operate the remote control. The

following instructions will work for either situation.

1

AR0914

10.3 Ensure that the left-hand control knob is pointing to off ( ).

10.4 Ensure that the right-hand control knob is pointing to off ( ).

10.5 Press in the right-hand control knob and rotate it anti-

clockwise until a click is heard (keep pressing in) and the

knob is pointing to pilot (

). The pilot should now

light.

If the pilot has not lit, repeat the procedure until it does.

10.6 Keep the control knob pressed for 10 seconds and then

release it, the pilot should stay alight. If the pilot goes out,

repeat the procedures until it does.

10.7 If the pilot will not light after repeated attempts, contact the

retailer or installer from whom the fire was purchased.

10.8 Turn the right-hand control to point to main burner (

).

The fire can now be controlled using the left hand

control knob.

10.9 Turn the left hand control knob to point to low fire (

),

the main burner will light on low. The burner can

now be controlled between low and high settings. Turn the

control

knob anti clockwise increase the flame height and clockwise

to decrease the flame height.


ThE yELLOw FLAMES wILL APPEAR whEN ThE FIRE hAS GAINED

SUFFICIEnT HEaT - TyPICaLLy 10 To 20 MInUTES.

I

f

the

pIlot

flame

Is

extInguIshed

,

IntentIonally

or

unIntentIonally

,

do

not

relIght

the

applIance

for

at

least

3

mInutes

.

1. COMMISSIONING

1.1 Close all windows and doors to the room, check all

controls, and allow fire to burn on maximum for 5 minutes.

Test for spillage of flue products using a smoke match. Pass

the lighted smoke match along the top front of the draught

diverter, just inside. See diagram 1.

1

AR1378

1.2 If the fire spills, run for a further 10 minutes and re-check.

1.3 If there are extractor fans in the room or adjacent rooms,

the spillage test must be repeated with the extractors

running on maximum.

IF SPILLAGE PERSISTS, DISCONNECT ThE FIRE AND SEEK

ExPErT adVICE.

For future reference record the installation details on the

commissioning sheet on page 3 of these instructions.