GE GEFanuc Automation Programmable Control Products TCP/IP Ethernet Communications for the Series 90t-70 PLC GFK-1004B User Manual

Page 5

Advertising
background image

Contents

v

GFK-1004B

TCP/IP Ethernet Communications User’s Manual – January 1996

Chapter 1

Introduction

1-1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

The Ethernet Communications System

1-1

. . . . . . . . . . . . . . . . . . . . . . . . . . .

The Ethernet Interface

1-2

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

The GEnet System Manager (GSM)

1-4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

How to Make it Work

1-6

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Quick Guide to the Manual

1-7

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Chapter 2

Installing the Ethernet Interface

2-1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Ethernet Interface Hardware Overview

2-1

. . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Board Indicators

2-3

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Restart Button

2-3

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Battery

2-4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Serial Port

2-4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

AUI (Transceiver) Port

2-4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Default Station Address Label

2-4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Serial Number Label

2-4

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Procedure 1: Installing the Ethernet Controller Board in the PLC

2-5

Equipment Required to Perform the Installation Procedures

2-5

. . . . . . . . . . . .

Ethernet Controller Board Installation

2-5

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Procedure 2: Verifying Proper Power-Up of the Ethernet Interface

2-7

Using the GSM “Access Station Manager” Function

2-7

. . . . . . . . . . . . . . . . . . . .

States of the Ethernet Interface

2-8

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Powering-Up the Ethernet Interface

2-9

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Problems During Power-Up

2-10

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Procedure 3: Configuring the Ethernet Interface with

Logicmaster 90-70 (PLC Module Configuration)

2-11

. . . . . . . . .

PLC Systems with CPU Firmware Version 5.03 or Later

2-12

. . . . . . . . . . . . .

PLC Systems with CPU Firmware Versions Prior to 5.03

2-16

. . . . . . . . . . . . .

Procedure 4: Configuring and Downloading a Station

2-20

. . . . . . . . .

Configuring a Station

2-20

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Downloading a Station

2-21

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Initiating the Download

2-22

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Problems During the Download

2-23

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

How to Issue the LOAD Command from the Station Manager

2-23

. . . . . . .

Procedure 5: Testing the Ethernet Interfaces on the Network

2-24

. . .

Field Network Test Utility

2-24

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Invoking the Field Network Test Utility

2-25

. . . . . . . . . . . . . . . . . . . . . . . . . . .

Running Field Network Test

2-26

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Advertising