GE GEFanuc Automation Programmable Control Products TCP/IP Ethernet Communications for the Series 90t-70 PLC GFK-1004B User Manual

Page 50

Advertising
background image

2

2-29

GFK-1004B

Chapter 2 Installing the Ethernet Interface

The TALLY L report provides more detailed information about faults than the TEST ALL
command. Acceptable tally rates are indicated on the Network Test Data Sheet. Note that
certain tallies should always be 0, while other tallies are acceptable if their average rate is
not excessive.

Record the LOG and TALLY L results for each Interface under test.

8.

At this point, you have completed your initial checkout of the Ethernet Interface and
its operation on the network. If the acceptance criteria is met, your Interface and
network meets requirements and no further testing is necessary. If the criteria is not
met, refer to Chapter 6, “Troubleshooting”, for the meaning of the log data and refer
to Chapter 5, “The Station Manager”, for meaning of the tally data.