2.3 SEQUENCE

OF

AUTOMATIC OPERATION

The generator’s control panel houses a control logic

circuit board. This board constantly monitors utili-

ty power source voltage. Should that voltage drop

below a preset level, circuit board action will signal

the engine to crank and start. After the engine

starts, the circuit board signals the transfer switch

to activate and connect load circuits to the standby

power supply (load terminal lugs T1/T2 connect to

terminal lugs E1/E2).
Upon restoration of utility source voltage above a

preset level, generator circuit board action signals

the transfer switch to transfer loads back to that

power supply. After retransfer, the engine is signalled

to shut down.
The actual sequence of operation is controlled by

sensors and timers on a control logic circuit board,

as follows:
A.Utility Voltage Dropout Sensor

• This sensor monitors utility source voltage.
• If utility source voltage drops below about 60 per-

cent of the nominal supply voltage, the sensor

energizes a 15-second (SA = six-second) timer.

• Once the timer has expired, the engine will crank

and start.

B.Engine Warm-up Time Delay

• This mechanism lets the engine warm up for

about 10 (SA = 15) seconds before the load is

transferred to a standby source.

C.Standby Voltage Sensor

• This sensor monitors generator AC output volt-

age. When the voltage has reached 50 percent of

the nominal rated voltage, transfer to standby

can occur.

D.Utility Voltage Pickup Sensor

• This sensor monitors utility power supply volt-

age. When that voltage is restored above 80 per-

cent of the nominal source voltage, a retransfer

time delay starts timing.

E.Retransfer Time Delay

• This timer runs for about 15 (SA = six) seconds.
• At end of a 15-second (SA = six-second) delay,

circuit board action de-energizes transfer relay in

the transfer switch.

• Retransfer to utility power source then occurs.

F. Engine Cool-down Timer

• When the load is transferred back to utility power

source, the engine cool-down timer starts timing.

• The timer will run for about one minute, and the

generator will then shut down.

NOTE:

Sound attenuated units have a control module
assembly (CMA) board that reads frequency sig-
nals from the stator battery charge windings and
relates them to engine speed or rpm. When AC fre-
quency reaches about 30 Hertz, cranking is termi-
nated and an engine warmup timer goes ON, run-
ning for approximately 15 seconds.

2.4 MANUAL

TRANSFER

OPERATION

2.4.1 TRANSFER TO GENERATOR

POWER SOURCE

To start the generator and activate the transfer switch

manually, proceed as follows:
1. Set the generator’s Auto/Off/Manual switch to

OFF.

2. Set the generator’s main circuit breaker to its

OFF (or open) position.

3. Turn OFF the utility power supply to the transfer

switch using the means provided (such as a

utility main line circuit breaker).

Do not attempt to activate the transfer switch
manually until all power voltage supplies
to the switch have been positively turned off.
Failure to turn off all power voltage supplies
may result in extremely hazardous and possibly
fatal electrical shock.

Figure 2.3 – Manual Transfer Switch Operation

4. Use the manual transfer handle inside the trans-

fer switch to move the main contacts to their

“Standby” position, i.e., loads connected to the

standby power source (Figure 2.3).

5. Turn ON the utility power supply to the transfer

switch using the means provided (such as a

utility main line circuit breaker).