32 --

MI00/10056 rev. 8 —05/2006

5.1

Electrical connections

WARNING!

All electrical connections must

be made by a qualified electrician

and meet local electrical code standards

Before attempting to connect the mains supply, the reserve/bypass supply or the load, ensure that all supplies, including
the

battery,

are

isolated

and

that

all

the

equipment

switches

are

in

their

»OFF»

position.

Open UPS front access panel and remove internal panel over main switches and terminal blocks.

NOTES:

1) Installation must be performed by a qualified electrician. The terminals require the use of
the proper crimp tools and terminals in order to perform an installation in accordance with the
National Electrical Code (NEC). The recommended crimp tools, terminals and torque are shown
in the following tables:

2) Use Copper Conductors Only

Table 1 – T&B’s Cat. N°s. for terminals and crimp tools

Terminals

Hole for screw

Wire

Size

(AWG)

M6

M10

Toggle

hand

Nest

(stationary)

tool

Indentor

(Moveable)

8

D10711

D975

11803

6

E10711

E975

11803

4

F10711

F975

11805

3

F10711

F975

11805

2

G971

G974

WT117

11806

11802

1

G671

G974

11806

1/0

H971

H974

11807

2/0

J971

J974

11808

3/0

K971

K974

11809

4/0

L971

L974

11810

Table 2 – Recommended torque

Torque

Type

Screw

Wrench

(mm)

(Nm)

(lb.in)

Used ON

Entrelec

M 35/26.FF

M6

10


4.5

39

EDP70Plus

up to 24kVA

-------

M10

17

39

340

EDP70Plus

above 24kVA

Advertising