3-16. Connecting Input Power

input_2 3/96 - Ref. 144 221 / Ref. 801 883-B

3/8 in

Tools Needed:

7/16 in

3/16 in

1

2

3

5

L3 (W)

L1 (U)

L2 (V)

7

10

8

4

9

6

!

Installation must meet all National and

Local Codes − have only qualified per-

sons make this installation.

!

Disconnect and lockout/tagout input

power before connecting input conduc-

tors from unit.

!

Make input power connections to the

welding power source first.

!

Always connect green or green/yellow

conductor to supply grounding terminal

first, and never to a line terminal.

!

When using multiple units which will be

linked with the synchronizing terminal

strip TE4, ensure that primary input pow-

er conductors are connected to each unit

in the same sequence (L1 to L1, L2 to L2,

and L3 to L3.)

.

See Section 3-17 for information on testing
for proper primary phase sequence.

See rating label on unit and check input voltage

available at site.
Remove left side panel.
1

Input Power Conductors (Customer

Supplied Cord)

Select size and length of conductors using

Section 3-15. Conductors must comply with

national, state, and local electrical codes. If

applicable, use lugs of proper amperage capac-

ity and correct hole size.
Welding Power Source Input Power Connec-

tions
2

Strain Relief

Route conductors (cord) through strain relief and

tighten screws.
3

Machine Grounding Terminal

4

Green Or Green/Yellow Grounding

Conductor

Connect green or green/yellow grounding con-

ductor to welding power source grounding termi-

nal first.
5

Welding Power Source Line Terminals

6

Input Conductors L1 (U), L2 (V) And L3

(W)

Connect input conductors L1 (U), L2 (V) and L3

(W) to welding power source line terminals.
Reinstall left side panel.
Disconnect Device Input Power Connections
7

Disconnect Device (switch shown in OFF

position)

8

Disconnect Device (Supply) Grounding

Terminal

Connect green or green/yellow grounding con-

ductor to disconnect device grounding terminal

first.
9

Disconnect Device Line Terminals

Connect input conductors L1 (U), L2 (V) And L3

(W) to disconnect device line terminals.
10 Overcurrent Protection
Select type and size of overcurrent protection us-

ing Section 3-15 (fused disconnect switch

shown).
Close and secure door on line disconnect de-

vice. Remove lockout/tagout device, and place

switch in the On position.

= GND/PE Earth Ground

4

6

Input Contactor

3

GND/ PE Earth Ground

=

Advertising
This manual is related to the following products: