Multitec

10

5.4.1 Vacuum balance line
Where liquid has to be pumped out of a vessel under vacuum, it

is advisable to install a vacuum balance line. This line shall have

a minimum nom. diameter of 25 mm and must extend above the

highest permissible liquid level of the vessel.
An additional pipeline fitted with a shut-off valve – from the

pump discharge nozzle to the balance line – facilitates venting

of the pump before start-up.

A Main shut-off valve

B Vacuum balance line

C Shut-off valve

E Vacuum-tight shut-off valve

R Swing check valve

V Vessel under vacuum

Z Intermediate flange
Fig. 11 Suction line and vacuum balance line

5.5

Connection to power supply
Connection to the power supply must be effected by a

trained electrician only (see 5.1)!

The applicable DIN VDE regulations or country-specific

guidelines must be complied with.

Check available mains voltage against the data on the motor

rating plate and select appropriate start-up method.
All connections shall be effected in accordance with the

technical specifications issued by the local energy supply

company.

We strongly recommend to use a motor protection switch.

5.5.1 Connecting the motor
Connect the motor in accordance with the circuit diagram in the

terminal box or as illustrated in fig. 12 or fig. 13.

Prior to starting the motor, check whether the wires

are firmly connected at the terminals and

re-tighten any loose wires.

n

configuration (low voltage)

Fig. 12

Connection diagram for three-phase motors,
n

configuration

Y configuration (high voltage)

Fig. 13

Connection diagram for three-phase motors,

Y configuration

5.5.2 Setting the time relay
Make sure that in the case of three-phase motors with star-delta

starting method switching over from star to delta will be effected

at very short intervals. Prolonged switchover intervals may

result in pump damage.
Recommended time relay setting for star-delta starting: 3 to 5

seconds, depending on motor rating.

EN 50014 (DIN VDE 0170/0171 Part 1) stipulates that

explosion-proof motors, type of protection IP 54, increased

safety (Ex)e, thermal class T3, must always be connected via a

motor protection switch.
5.5.3 Checking the direction of rotation

On pumps fitted with uni-directional mechanical

seals (seal codes 62 and 63) the direction of

rotation must never be checked with the pump coupled to the

motor. If the pump/motor coupling does not have to be removed,

make sure that the pump has been primed before checking the

direction of rotation.

The motor’s direction of rotation must correspond to the

direction indicated by the arrow on the pump or motor

(clockwise when seen from the motor end; on version D

anti-clockwise). Verify by switching the motor on and then off

again immediately.

If the pump runs in the wrong direction of rotation, interchange

any two phases L1, L2 or L3 of the power cable in the motor

terminal box.