Multitec – Multitech 1777.8/7-10 G3 User Manual

Page 21

Advertising
background image

1

2

3

4

Caution

l

d

i

d

a

Multitec

21

7.4.1

Tightening torques - Tie bolts, part No. 905

Material codes 10, 11, 12, 13 (casing: cast iron)

Pump size

Tightening torque Nm

Multitec 32

85

Multitec 50

140

Multitec 65

250

Multitec 100

395

Multitec 125

600

Multitec 150

700

Material code 20 to 30

(Casing: steel or stainless steel)

Pump size

Operating pressure

(bar)

Tightening torque

Nm

Multitec 32

150

Multitec 50

240

Multitec 65

All

430

Multitec 100

All

680

Multitec 125

1370

Multitec 150

≤ 40

1500

Multitec 150

> 40

2000

7.4.2

Reassembly of hydraulic system

Reassembly of the hydraulic system starts at the suction end
and proceeds towards the discharge end. It is advisable to
place the pump in vertical position for reassembly. The
sequence of reassembly does not pose any special problems

and shall be realized in accordance with the detailed sectional
drawing and list of components. The components shall be
re-installed in the same place as before dismantling.
A clearance of 0.7 to 1.2 mm shall be set between the last
impeller 230.1 or 230.3 and the balance drum 59-4 (or spacer
sleeve 525.4).

When tightening the tie bolts, proceed as follows:
- Tighten the nuts of tie bolts 905 gently, with the pump in

vertical position.

- Set the pump horizontally onto its feet on the assembly table.
- Tighten the nuts of tie bolts 905 in two steps (first step: 50% of
nominal torque, second step: nominal torque) in the sequence

1.4.2.3.

Fig. 37

7.4.3

Seals

Gland packing
Before re-packing, thoroughly clean the packing chamber and

the gland cover.

Packing rings must be inserted so that the cut

edge of each ring is displaced by approx. 90° to

120° in relation to the previous one.

Slip the pre-stressed packing rings onto the shaft protecting

sleeve, press home the first packing ring with the help of the

gland cover. Each packing ring must be pressed into the

packing chamber individually, using the gland cover.

On gland packings with lantern ring (for vacuum operation), the

lantern ring is mounted instead of the next to last packing ring

(the last packing ring is located in the seal chamber on the pump

side).

Tighten the gland cover by hand at first. Use a feeler gauge to

check the level position of the gland cover. It must be easy to

turn the rotor by hand.

Leakage is normal during pump commissioning. After approx. 5

minutes’ operating period, the amount of leakage can be

reduced by steadily tightening the nuts of the gland cover by 1/6

of a turn. Keep an eye on the amount of leakage and the water

temperature. It takes several hours of pump operation for the

gland to be adjusted completely. There must be a high leakage

rate during the running-in period.

Repeat this procedure every 5 minutes until a minimum value is

reached.

Dimensions in

Pump size

Dimensions in

mm

32 - 50 - 65

100

125

150

Packing

cross-section

10 j

12,5 j

16 j

Length of

packing cord

≈181

≈223

≈254

≈306

Number of

packing rings

5

6

Stuffing box housing

Pump size

d

i

d

a

l

32 - 50 - 65

45

65

50

100

56

80

60

125

66

90

72

150

78

110

96

Fig. 38 Gland chamber dimensions

Advertising