Multitec, 3transport, storage – Multitech 1777.8/7-10 G3 User Manual

Page 5

Advertising
background image

Caution

Caution

Multitec

5

2.5 Safety instructions for the operator / user
- Any hot or cold components that could pose a hazard must

be equipped with a guard by the operator.

- Guards which are fitted to prevent accidental contact with

moving parts (e.g. coupling) must not be removed whilst the

unit is operating.

- Leakages (e.g. at the shaft seal) of hazardous fluids handled

(e.g. explosive, toxic, hot) must be contained so as to avoid

any danger to persons or the environment. All relevant laws

must be heeded.

- Electrical hazards must be eliminated. (In this respect refer

to the relevant safety regulations applicable to different

countries and/or the local energy supply companies.)

2.6 Safety instructions for maintenance, inspection and

installation work

The operator is responsible for ensuring that all maintenance,

inspection and installation work be performed by authorized,

qualified specialist personnel who are thoroughly familiar with

the manual.

Work on the machine / unit must be carried out only during

standstill. The shutdown procedure described in the manual for

taking the unit out of service must be adhered to without fail

(section 6.3).
Pumps or pump units handling fluids injurious to health must be

decontaminated.
Immediately

following

completion

of

the

work,

all

safety-relevant and protective devices must be re-installed and

/ or re-activated.
Please observe all instructions set out in the chapter on

”Commissioning” (6.1) before returning the unit to service.
2.7 Modification and manufacture of spare parts by

customer

Modifications or alterations of the equipment supplied are only

permitted with KSB’s prior approval. Original spare parts and

accessories authorized by KSB ensure safety. The use of other

parts will invalidate any liability of the manufacturer for

consequential damage.
2.8 Unauthorized modes of operation
The warranty relating to the operating reliability and safety of the

pump is only valid if the machine is used in accordance with its

designated use, i.e. with the technical data specified. For further

details please refer to the information in section 4 of this

operating manual. The limits stated in the data sheet must not

be exceeded under any circumstances.

3

Transport, storage

3.1 Transport / Handling
Transport of the unit requires proper preparation and handling.

Never use the motor eyebolt for lifting the unit.
If the pump / unit slips out of the suspension

arrangement, it may cause personal injury and damage

to property!

Do not use lifting gear which may damage the pump (e.g.

no chains).

Fig. 1 Transport of pump only

Fig. 2 Transport of pump unit
For transporting the unit, lifting ropes shall be attached to the

pump and the motor as shown above. Never use the motor

eyebolt for lifting the unit!

Fig. 3 Transport of close-coupled pumps and vertical pumps

3.2 Storage / Preservation
Unless otherwise stated in the purchase order and order

confirmation, the pumps are supplied by our factory duly

preserved for a storage period of 3 months from delivery. We

recommend to take the following additional measures if the

pump is stored for a prolonged period of time prior to

commissioning:

Indoor storage of new pumps:

New pumps are preserved for indoor storage in a dry, closed

room in their original, unopened packaging for a maximum

period of 3 months.

Protect all stored goods against moisture, dirt,

vermin and unauthorized access! All openings of

the assembled unit components are closed and must only be

opened when required during installation.
Outdoor storage with the packaging unopened:

Protect the pump/unit against moisture, dirt, vermin and

unauthorized access.
It is imperative to remove the preservative prior to normal

commissioning by flushing through the system.
If the pump is to be stored for more than 3 months

(optional, specified in the purchase order):

New pump/unit:

New pumps/units are specially preserved in the manufacturer’s

factory.

It is imperative to remove the preservative prior to normal

commissioning by flushing through the system.

The product used for this purpose is not suitable

for potable water systems and must be removed

completely by dismantling and subsequent cleaning of all parts

of the pump coming into contact with the fluid handled, if

required. For further information please refer to the order

confirmation.
The unit/pump is installed some time before the system is

commissioned:

Special measures have to be taken for prolonged shutdown

periods, to make sure that the pump is always ready for instant

start-up and to prevent the formation of deposits within the

pump’s hydraulic system and intake area (see section 6.3.1).

Advertising