Matsushita CF-W4HWEZZBM User Manual

Page 54

Advertising
background image

3. Screw tightening of Bottom Case

1.The screw tightening is done in the undermentioned order.
3-1. DXHM0039ZA(E:N6) is tightened.No.1 to No.3
3-2. DXHM0057ZA(C:N7) is tightened. No.4,No.5
3-3. DXQT2+E12FNL(F:N11) is tightened. No.6 to No.9
3-4. DXQT2+E10FNL(D:N10) is tightened. No.10
3-5. DXQT2+D4FNL(H:N9) is tightened. No.11
3-6. DRHM0092ZA(B:N4) is tightened. No.12 to No.14

Screw (H)

Screw (E)

Screw (C)

Screw (D)

Screw (F)

Screw (E)

Screw (F)

Screw (F)

Screw (B)

Screw (E)

Screw (B)

Screw (B)

Screw (C)

Screw (F)

6.3.15. Specification of affixation of PET tape to Heat Spreader

1~2mm

1~2mm

<The Main Board Side>

<The Back Completion Chart>

Heat Radiation Grease(G-751)
Spread with a treatment device.

Heat Spreader

PET Tape

PET Tape

The extent that length
remains pastes on an
opposite side.

The extent that length

remains pastes on an

opposite side.

Never touch the aluminum edge part directly by bare-handed when the part of aluminum with a thin all

surroundings bends. Correct in that case with a radio pincers etc. and instal.

54

Advertising