Air purging – Sanyo CHX03652 User Manual

Page 192

Advertising
background image

5-4

Test Run and Others

1

2

3

4

5

6

7

8

Fig. 5-5

Fig. 5-6

Charging additional refrigerant

Charging additional refrigerant (calculated from

the liquid tube length as shown in Section 2. 2-7
“Additional Refrigerant Charge”) using the liquid
tube service valve. (Fig. 5-5)

Use a balance to measure the refrigerant accurately.

If the additional refrigerant charge amount

cannot be charged at once, charge the remaining
refrigerant in liquid form by using the gas tube
service valve with the system in cooling operation
mode at the time of test run. (Fig. 5-6)

Finishing the job

(1) With a hex wrench, turn the liquid tube service

valve stem counter-clockwise to fully open the

valve.

(2) Turn the gas tube service valve stem counter-

clockwise to fully open the valve.

(3) Loosen the charge hose connected to the gas

tube service port (for ø5/16'' tube) slightly to

release the pressure, then remove the hose.

(4) Replace the service port cap on the gas tube

service port and fasten the cap securely with an

monkey spanner or box wrench. This process is

very important to prevent gas from leaking from

the system.

(5) Replace the valve caps at both gas tube and liquid

tube service valves and fasten them securely.

This completes air purging with a vacuum pump. The

air conditioner is now ready for a test run.

CAUTION

Use a cylinder designed for

use with R410A respectively.

CAUTION

To avoid gas from leaking when

removing the charge hose,

make sure the stem of the gas

tube is turned all the way out

(“BACK SEAT” position).

Valve

Liquid

Manifold valve

Pressure
gauge

Lo

Hi

Outdoor unit

Liquid
tube

Gas
tube

Close

Open

Close

Close

R410A

Outdoor unit

Liquid
tube

Gas
tube

Open

Close

Open

Open

1. Air Purging

Advertising
This manual is related to the following products: