Blower, Step 8 120 vac to blower – State Industries Utra-Force STC-077 User Manual

Page 26

Advertising
background image

S U F S E R V I C E H A N D B O O K

T R O U B L E S H O O T I N G

State Water Heaters

Technical Training Department

Ashland City, Tennessee © 2004

25

STC-077

BLOWER

STEP 8: CHECK FOR 120 VAC TO BLOWER FROM CN2 PLUG PIN 1 AND 2.
Condition:

• Reconnect all plugs to control board.
• On/Off switch is on.

• Call for heat is activated.

Insert meter probes into back of CN2 plug on pins 1 and 2 with CN2 plugged in, power on, and a
call for heat activated.

STEP 8

120 VAC TO BLOWER

IF…

AND

THEN

120 VAC is not
present

replace the control board if call for heat is active and Step 7 has been
performed and results were successful — continue to Step 9A.

Advertising