120 vac to ignitor – State Industries Utra-Force STC-077 User Manual

Page 29

Advertising
background image

S U F S E R V I C E H A N D B O O K

T R O U B L E S H O O T I N G

Technical Training Department

State Water Heaters

STC-077

28

Ashland City, Tennessee © 2004

120 VAC TO IGNITOR

STEP 10: CHECK FOR 120 VAC TO IGNITOR FROM PIN 1 AND 2 ON CONTROL BOARD
TERMINAL CN5.
Condition:

• Disconnect CN5 plug from control board.
• On/Off switch is on.

• Call for heat is activated.
• Perform test during ignitor warm up period.

STEP 10

120 VAC TO IGNITOR

IF...

THEN

120 VAC is not present

replace the control board if Steps 7 through 9B have
been performed and results were successful.

120 VAC is present

continue to step 11.

Advertising