SMC Networks Air Weigh AW5800 User Manual

Page 18

Advertising
background image

18

Figure 7

10. Mounting the brackets on the axle. Place the bracket
assembly in the center of the axle (Figure 7). Make sure the
center mark on the alignment tool lines up with the center
mark on the axle.

Figure 8

11. Run a band clamp (139-0011-000) through the slot in
the bottom of each bracket (Figure 8). Tighten the band
clamps very firmly to secure the brackets in place, ensuring
that the bracket assembly remains parallel to the axle
length.

Advertising