extension cable. As in Step 34, route the sensor extension
cable across the axle, along the frame, and through the cab

firewall to the mounted AW5801 Truck Scale Comlink.
Connect the sensor connector to the 15' sensor extension
cable (014-1500-028) to form a connector assembly.

NOTE:

Check A/D readings, if they are below 750 repeat

Steps 31 a - c. If they are above 1250, repeat Steps 31 d - f.
If the previous adjustments do not bring the A/D readings into
acceptable range then both nuts must be loosened and the
process repeated from Step 28. The sensor cable may also
need to be disconnected if using the Deflection Sensor Install
Test Fixture.

Following sensor installation, do not calibrate until

after the vehicle has been in normal operation for a
week or 800 miles, whichever comes first. This allows
for a break-in period for the sensor.
Do not operate the
vehicle with the alignment tool in place.

For calibration, refer to the Air-Weigh manual for the
AW5800 Truck Scale included in your kit.

38. Cover installation. Very loosely install band clamps
(139-0011-000) around the axle on both sides of the
installed sensor. Ensure that the band clamp encircles both
the axle and the sensor extension cable.