Facilities required – Speed Queen Drying Tumblers SCB50EG User Manual

Page 33

Advertising
background image

31

M412616

SECTION II

Installation Instructions

Upon delivery, visually inspect crate carton and parts
for any visible shipping damage. If crate, carton
or cover are damaged or signs of possible damage
are evident, have carrier note condition on shipping
papers before shipping receipt is signed, or advise
carrier of condition as soon as it is discovered.

Remove crate and protective cover as soon as
possible and check items listed on packing list.

Advise carrier of any damaged or missing articles as
soon as possible. A written claim should be filed with
carrier immediately if articles are damaged or
missing.

IMPORTANT: Remove shipping tape from two
back draft dampers located in exhaust thimble

.

RECEIVING INSPECTION

MATERIALS REQUIRED (Obtain Locally)

GAS, ELECTRIC OR STEAM DRYING
TUMBLERS

•••••

One circuit breaker.

GAS DRYING TUMBLERS ONLY

•••••

One gas shut-off valve for gas service line to each
tumbler.

STEAM DRYING TUMBLERS ONLY

•••••

One steam shut-off gate valve for steam service
line to be connected upstream of solenoid steam
valve.

FACILITIES REQUIRED

FLOOR

Drying tumbler may be installed on any level floor
capable of supporting 100 pounds per square foot
(488 kg/m

2

). Floor covering materials such as

carpeting or tile should be removed.

LAYOUT

Whenever possible, tumbler should be installed along
an outside wall where duct length can be kept to a
minimum, and make-up air can be easily accessed.

Construction must not block airflow at top rear of
tumbler. Doing so would prevent adequate air supply
to tumbler’s combustion chamber.

VENTING

For maximum efficiency and minimum lint
accumulation, tumbler air must be exhausted to
outdoors by shortest possible route.

•••••

Two steam shut-off gate valves for each
condensate return line.

•••••

Flexible steam hoses with a 125 psig (pounds per
square inch gauge) (8.79 kg/sq. cm) working
pressure for connecting steam coils,

Figures 24

and

25.

•••••

Two steam traps for steam coil outlet to
condensate return line.

•••••

One steam pressure relief valve rated at 125 psig.
(8.79 kg/cm

2

).

Advertising