Kohler COMMAND CH18-745 User Manual

Page 210

Advertising
background image

11.25

Section 11

Reassembly

11

Figure 11-83. Throttle/Choke Control Bracket Detail.

Install Oil Sentry

(If So Equipped)

1. Apply pipe sealant with Teflon

®

(Loctite

®

No.

59241 or equivalent) to the threads of the Oil
Sentry

switch and install it into the breather

cover. See Figure 11-84. Torque to 4.5 N·m
(40 in. lb.)
.

2. Connect the wire lead (green) to the Oil Sentry

terminal.

Install Control Panel (If So Equipped)

1. Install the panel to the blower housing.

2. Connect the throttle control cable or shaft.

3. Connect the choke control cable to the control

bracket.

4. Connect the Oil Sentry™ indicator light wires.

Figure 11-84. Installing Oil Sentry

Switch.

Item

Description

1

Bracket, speed control

2

Clamp, cable (some applications)

3

Kill Switch (some applications)

4

Lever, choke (top position)

5

Lever, throttle control (middle)

6

Linkage, choke control

7

Lever, throttle actuator (bottom)

8

Screw, M5x0.8x20

9

Washer, wave

10

Washer, flat (3)

11

Spring, choke return

12

Nut, M5x0.8 lock

Advertising