F-29

TROUBLESHOOTING & REPAIR

ACTIVE SCR TEST

(continued)

PROTECTION/SNUBBER

L9255

J10

J11

J12

J13

J14

J15

REMOVE PLUGS J10 & J13

TEST PROCEDURE

1.

Remove main supply power to machine

2.

Remove plugs J10 and J13 from protec-
tion/snubber board. See Figure F.13.

3.

Remove red insulating paint from heat
sink test points. See Figure F.14. DO
NOT DISASSEMBLE THE HEAT
SINKS.

FIGURE F.13 - PROTECTION/SNUBBER BOARD PLUG LOCATIONS.

SCR1
ANODE

CATHODE
(1 & 2)

SCR2
ANODE

SCR3
CATHODE

SCR4
CATHODE

ANODE
(3 & 4)

PLUG
P10

FIGURE F.14 - SCR TEST POINTS.

4.

Perform test procedure as outlined in
Figure F.15. Repeat test for all four
SCR’s

5.

Replace any SCR assembly that does
not pass test in Step 4