Jumping to a specified point, Gopoint, gorpoint, gocrpoint – Loctite CARTESIAN 400 User Manual

Page 81

Advertising
background image

Jumping to a specified point:

goPoint, goRPoint, goCRPoint


The following explains how to jump to a specified point after carring out a point job instead of going
to the next point.

Command

Category

Command Parameter

Job

PTP Condition Number,

Jumps to a specified point.

goPoint

Point Number

goRPoint

PTP Condition Number,
Relative Point Number

Jumps to a specified relative point.

Execute Flow
Control

goCRPoint

PTP Condition Number,
Destination selection

Jumps to a specified destination while
running in CP drive.

The commands “goPoint”, “goRPoint” and “goCRPoint” are invalid at the CP Passing Point or a
point whose Base Type is CP Passing Point.

Point Number or Relative Point Number of “goPoint” and “goRPoint” can be set using variables
or expressions.

A destination for “goCRPoint” can also be set using variables or expressions. In this case, the
value must be either “0” or “1,”

#genIn2=ON

waitStartBZ

goRPoint PTP3,8

Example: Below: is the Point Job Data for the
operation shown in the chart to the right.

waitCondTime 500
ld #genIn2
timeUp
waitStartBZ
goRPoint PTP3,8
endWait


The above commands carry out the following
operation:
When #genIn2 does not turn ON within 0.5 sec, the alarm buzzer will sound and the robot will wait
until a start signal is received. After a start signal is received, operation will restart at the current
reference point, plus 8.

Features II CARTESIAN Benchtop Robot

63

Advertising
This manual is related to the following products: