Indoor installations – Raypak RAYTHERM 133-4001 User Manual

Page 10

Advertising
background image

10

1. Remove jacket top panel.

2. Remove and discard inner stack adapter panel.

3. Install jacket top panel.

4. Insert tabs of outdoor top into keyholes located on

jacket top panel (4 places). See Detail A.

5. Snap tabs on outdoor top into the locked position

of the keyhole so the top will not pull out. See

Detail B.

Models 514-824

1. Lower outdoor top onto unit. Position top so it is

centered on unit from side to side and front to rear.

2. Tighten the (4) screws (as indicated in Fig. 8) until

they come in contact with the unit jacket top, then

evenly tighten all (4) screws to secure to unit.

Models 926-1758

Boilers are shipped with outdoor vent terminal factory

installed.

Indoor Installations

Model 133

1. Shut-off main electrical power switch to boiler.

2. Turn heater manual switch located in upper control

panel to the "OFF" position.

3. Shut-off gas supply and water supply to the boiler.

4. Mount drafthood on boiler and attach with the

sheet metal screws provided. Drafthood should be

positioned with the vent sensor located on the

front left side (see next page).

5. Remove plastic plug from left side of boiler jacket

and install the plastic grommet provided.

6. Route flue sensor wire harness through the grom-

met installed in Step 5.

7. Remove door and locate wire from roll-out sensor

to high limit with the male/female connector.

8. Disconnect male/female connector and attach to

the 2 wires from drafthood vent sensor harness.

Outdoor Top

(Shipped Loose with Heater)

Detail A

Detail B

Fig. 6: Installing Outdoor Top—Models 181-401 & 182-

400

Fig. 7: Installing Outdoor Top—Models 514–824

JACKET TOP

FASTENING
SCREW

Fig. 8: Installing Outdoor Top Detail—Models 514–824

Advertising