Vent Damper Installation

(Models 133 Through 261)

Where Required

Location

The vent damper must be located in the vent so that it

serves only the appliance for which it is intended.

If improperly installed, a hazardous condition, such as

an explosion or carbon monoxide poisoning, could

result. Make certain that it is mounted in an accessible

location at least 6 inches from any combustible mate-

rial or the heat exchanger, and that the position

indicator is in a visible location.

The vent damper must be installed after the appliance

drafthood, as close to the drafthood as practicable,

and without modification of the drafthood.

On vertical vents, the vent damper may be mounted

with the actuator in any position. On horizontal vents,

do not mount the actuator either directly above or

directly below the vent pipe; mount the vent damper

actuator to the side of the vent.

The vent damper is set up for a continuous pilot sys-

tem. If the vent damper is installed on an Intermittent

Pilot or Direct Spark Ignition equipped system, the

energy savings of the vent damper can be improved

by plugging the hole in the vent damper blade using

the knockout plug, Part No. 105612R, provided in the

parts envelope.

DO NOT plug the hole if installing the vent damper on

a continuous pilot system as this will create a hazard.

Fig. 17: Vent Damper Installation (Model 133 Drafthood

Shown)

WARNING: Do not use thermally actuated vent

dampers on a modulating boiler. To do so may result

in asphyxiation. Use only a mechanically actuated

vent damper device that is electrically interlocked

with the modulating boiler operation.

HORIZONTAL INSTALLATION

TO BOILER

D80B

TO CHIMNEY

NO

NO

YES

YES

VERTICAL
INSTALLATION

TO CHIMNEY

VENT DAMPER

TO BOILER

INSTALL VENT DAMPER
WITH ACTUATOR TO
SIDES OF VENT ONLY.
DO NOT MOUNT ABOVE
OR BELOW VENT.

FLOW >

ACTUATOR MAY BE
INSTALLED IN ANY
POSITION ON VERTICAL
PIPE

????? ?????? ??????? ?????????? ??

??? ?? ???????? ?????????? ?? ????

?????

D80B

N. O.

N. C.

END
SWITCH

C.

1K2

1K1

R

1K3

1

2

3

4

5

1R

BLACK

ORANGE

RED

YELLOW

BLUE

THERMOSTAT OR
CONTROLLER

LIMIT

OPTIONAL LIMIT
LOCATION

TRANSFORMER

DUAL VALVE
COMBINATION
GAS CONTROL OR
IGNITION SYSTEM

1

1

L1

L2

(HOT)

POWER SUPPLY PROVIDE DISCONNECT MEANS AND OVERLOAD PROTECTION AS REQUIRED

Fig. 18: Horizontal/Vertical Vent Damper Installation

Fig. 19: Vent Damper General Wiring Diagram

Advertising