Flush mount control units – Raymarine autopilot + ST4000+ User Manual

Page 65

Advertising
background image

50

ST4000+ Wheel & Tiller Autopilots: Owner’s Handbook

5

Install

ing

the

ST4000+

Flush mount control units

To fit a flush mount control unit:

1. Ensure that the intended mounting location is between 3 mm

(

1

/

8

in) and 20 mm (

3

/

4

in) thick.

2. Apply the flush mount template (supplied at the back of this

handbook) to the selected location. Mark the aperture into which
the control unit will sit, then remove the template.

3. Use a jigsaw to cut out this aperture.
4. Peel the protective sheet from the self-adhesive gasket, then stick

the gasket into position on the rear of the control unit surround.

5. Screw the two fixing studs into the threaded sockets on the rear of

the control unit.

6. Pass the cables (power, compass, SeaTalk, etc.) through the

bulkhead and connect them to the appropriate terminals (as
described later in this chapter).

7. Place the assembled control unit, studs and gasket into the panel.
8. Locate the bracket onto the fixing studs and secure the assembly

to the panel with the thumb-nuts. Hand-tighten the thumb nuts –
do NOT use a wrench.

D4585-2

Fixing

stud

Thumb

screw

Bracket

Aperture

cut-out

Self-adhesive

gasket

Advertising