L2 l1 – Roberts Gorden 125 User Manual

Page 31

Advertising
background image

SECTION 10: W

IRING

23 of 47

10.3 UHD[X][S] Series Internal Wiring Diagram

IMPORTANT:
For field wiring into service junction box, or if any of the original wire supplied with the heater
must be replaced, it must be replaced with wiring material having a temperature rating of at least 105° C
(221° F) and 600 V. For supply connections, use No. 14 AWG or larger wires.

BLUE

BLACK

ORANGE

ORANGE

YELLOW

BROWN

WHITE

WHITE

L2 L1

ORANGE

ORANGE

BLACK

BLACK

GREEN

WHITE

BLUE

BLACK

GREEN

BLUE

GREEN

YELLOW

24 V

AC

HOT

GROUND

FLAME

BLACK

BLACK

6

3

4

2

1

4

5

3

1

SENSE

ELECTRODE

LIMIT SWITCH

PRESSURE SWITCH

GAS VALVE

IGNITION MODULE

TRANSFORMER

LIMIT SWITCH (UHD 300, 350, 400 ONLY)

MANUAL RESET LIMIT SWITCH (UHD 75 ONLY)

THERMOSTAT INPUT: FIELD SUPPLIED

R = 24 VAC TO THERMOSTAT (RED)

G = MANUAL FAN INPUT FROM THERMOSTAT (GREEN)

W = HEAT DEMAND INPUT FROM THERMOSTAT (WHITE)

C = COMMON GROUND TO THERMOSTAT

FLUE

BLOWER

R

G

W

C

ACC

L1

CMB BLOWER

5

Advertising
This manual is related to the following products:

75, 100