Installing the water heater – Rheem RS80-42BP User Manual

Page 20

Advertising
background image

20

Installing the water heater.

Wood Runner Detail for 16” & 24” On-Center Rafters for Standard Installation

Collector Extrusion Detail for Standard Installation

CAUTION: The

Extrusion must slope
1/2” per collector
from horizontal (hot
pipe side to be higher)
for the system to work
correctly.

!

Metal or Tile Installation

1. Mark tank location on roof with

front foot of tank located directly
over reinforced roof area.

2. Measure 82 inches down roof

from front foot of tank to
determine location for Collector
Extrusion.

3. For Tiled roofs, remove tiles to

allow for room to screw collector
straps to rafters or trusses. If
installing three collectors, remove
tiles for third collector strap.

4. Slide the Collector Extrusion on

to the Collector Straps. After
leveling, raise the hot pipe side of

the extrusion by 1/2” per
collector to ensure correct
operation of the system (eg. For a
2 collector system, raise the hot
pipe side of the extrusion by 1”).

6. Attach straps onto rafters or

trusses with 5/16” x 6" lag
screws.

7. Replace tiles that have previously

been removed.

8. Flash and seal all roof

penetrations.

9. Continue with Collector

Installation.

NOTICE: Be sure the
flat side of the vertical
support of the extrusion
faces toward the
collector location and
the “U” shape opens
toward the lower roof
edge.

Advertising
This manual is related to the following products: