Pre-installation – Rheem RS80-42BP User Manual

Page 9

Advertising
background image

9

Pre-Installation

These installation inspection procedures include;

• Review of local building codes for site

requirements and specific guidelines for plumbing

and electrical installation.

• Inspection of installation site.

• Completion of the Pre-installation Checklist,

including customer’s signature.

Site Inspection Equipment

• Pre-Installation Inspection Checklist

• Pencil or pen

• Ladder

• Tape measure

• Flashlight

• Water pressure gauge

• Pitch gauge

• Compass

Review Local Codes

• Review local codes and record on checklist:

• Area requirements

• Plumbing requirements

• Electrical requirements

• Roof support stress load and modification

requirements (including engineering review, if

necessary).

Obtain building plans, if possible, to help locate

bearing walls and determine truss strength.

Record extreme weather conditions on

checklist;

• Heavy-snowfall areas require roof-ridge

mount, see Figure below.

• High-wind areas require an additional

Bracing Kit.

• Installation sites subject to winds of more

than 50 m.p.h. require a specially

engineered frame.

• Cold areas need freeze protection for all

domestic plumbing lines.

This section will guide you to gather the necessary information to install the system correctly. Use it
together with the Installation Checklist to identify all installation requirements.

Roof Ridge Mounts

Advertising
This manual is related to the following products: