Solar circuit circulation, Commissioning – Rheem Water Heater User Manual

Page 60

Advertising
background image

COMMISSIONING

60

ircuit fluid on the side of the solar

r.


Sola

9.

onnecting plug l

tab i

cover opening.

It is
proc
com
the solar circuit is complete, to

othe

trical

supply is
pum
hour

it

no solar gain

10. Swit

tank

8. Mark the static level of the closed c

storage tank with a non permanent marke

r Circuit Circulation

Disconnect the hot sensor lead from the c

n the upper front

ocated on the

important, at the end of this

edure when the

missioning and checking of

reconnect the hot sensor lead,

rwise when the elec

switched on, the solar

p will deactivate after one

and the solar control un

will then enter a fault mode and

will be achieved.

ch on the electrical supply at the isola
.

disconnect

hot sensor

lead

ting switch to the solar storage

W

ea inside the solar sto

k

behi

power is on as the electrical circuit will

ping closed circuit fluid around

lear hose will slow

inutes (one and two

cto

ill operate for one hour with th

tself off

(refer to step

13

)

.

arning: Take care not to enter the ar

nd the front covers whilst the

rage tan

be live.

The red LED on the solar monitor label will

The pump will activate and commence pum
the solar circuit.

start flashing.

The level of the closed circuit fluid in the c
dynamic operating level.

Allow the pump to operate for three (3) m
systems) or for five (5) minutes (3 collecto
circuit to fill with closed circuit fluid and stabilise.

Note: The solar pump w

ly drop to the

colle

r

r system) to allow the solar

e hot sensor lead

disconnected, before automatically turning i

Advertising