COMMISSIONING

71

Circuit

b

is

elec
the
after
cont

a fault

sola

31. Rep

d upper front covers of the solar storage tank.

cting the ribbon cable to

ver opening. The

32. Clean off the marks made on the side of the solar storage tank.

33. Remove the covers from the solar collectors.

34. Switch on the electrical supply at the isolating switch to the solar storage

tank.

Completing the Commissioning of the Solar

30. Reconnect the hot sensor lead to

the connecting plug located on the
ta

in the upper front cover

opening.

It important to reconnect the hot
sensor lead, otherwise when the

trical supply is switched on,

solar pump will deactivate

one hour and the solar

rol unit will then enter

reconnect

hot sensor

lead

mode, will not operate and no

r gain will be achieved.

lace the lower an

ƒ

If the ribbon cable from the solar monitor has been disconnected,
reconnect it to the solar control module prior to replacing the lower
front cover.

Note: Care should be taken when reconne
the solar control module to ensure the side of the connecting plug with
the yellow label is facing toward the front co
connecting plug is non polarised and if it is connected with the side of
the connecting plug with the yellow label facing away from the front
cover opening, the functions of the green and red LEDs will be
reversed. This will result in the red LED flashing instead of the green
LED at solar pump start up.