Roberts Gorden CoRayVac CRV-B-6 User Manual

Page 24

Advertising
background image

CRV-S

ERIES

I

NSTALLATION

, O

PERATION

AND

S

ERVICE

M

ANUAL

18

Step 7.1 Tube Installation

Step 7.2 Coupling and Tube Assembly

Combustion

Chamber

7' 6"

(229 cm)

Combustion

Chamber

NOTE: Tubing requires a downward slope of

1/2" (13 mm) per 20' (6 m) away from

burner. Tailpipe tubing requires a

downward slope of 1" (26 mm) per

20' (6 m) away from burner.

10'

maximum

(3 m)

End View

Weld

Seam

Bottom

of Tube

Hanger

Turnbuckles

Tube

Description

Part Number

Tube

91409XXX

Turnbuckle

91903201

Tube/Reflector Hanger

03090100

Tube

Tube

Orient coupling so that

the impact block is in the

2:00 or 10:00 o’clock

positions.

Closed

Open

Tab

3" (8 cm) to

4" (10 cm)

Slide Bar/Coupling Lock

Coupling

Wide End

Coupling

Tube

Slide Bar/Coupling Lock

A

Close coupling with tab.

B

Start slide bar/coupling lock
onto coupling.

C

Insert tubes into coupling.

D

Tighten coupling to join tubes.

Description

Part Number

Coupling

01329600

Slide Bar/Coupling Lock

01329700

Tube

91409XXX

Advertising
This manual is related to the following products: