Associations power control, Figure 111 associations power control – Raritan Computer SX User Manual

Page 178

Advertising
background image

160

D

OMINION

SX

U

SER

G

UIDE

Associations Power Control

Click Associations Power Control on the Power Control menu to access the tool to manage
power control associations.

Figure 97 Associations Power Control

Note: When executing power on/off operation, about ~5 seconds are added to the
configured sequential interval, resulting in an operational delay time (minimum amount of
time to operate). If power cycle is selected, all associated outlets will be powered off
sequentially, and then powered on sequentially. The cycle delay time reacted here
determines the minimum length of time needed to turn back on the outlets after they’re
shut down, which is user-specified by administrator. The delay time to experience would be
operational delay + user-specified delay.

Advertising