For new construction, to determine chimney

center line, use plumb line from roof or ceil-

ing above fireplace to center of flue collar on

fireplace.

For remodeling, plumb to center of flue collar

from ceiling above, drive nail through ceiling

from below to mark position, then mark and

cut to passage from above ceiling (around nail)

(Figure 19). Then plumb from ceiling or roof

level directly above hole which has just been

completed.

Plumb line

step 3. Position appropriate thimble/firestop

spacer combination at ceiling and nail

temporarily with two (2) 8d nails or

equivalent fasteners (see Figures 21, 22

and 23). Use thimble/firestop spacer,

model FM8-AT2, if chimney penetrates

ceiling vertically. If chimney penetrates

ceiling at 30˚ angle (offset) chimney use

Model F8FS30-2. Use one fastener on

opposite sides to hold thimble/firestop

spacer combination in position. Nail

permanently, using at least two (2) more

fasteners, after chimney sections have

been assembled through the thimble/

firestop spacer combination and after any

necessary adjustments have been made.

Firestop spacer must be secured by at

least four (4) fasteners when completely

installed.

Note: If there is a room above ceiling level,

firestop spacer must be installed on the bottom

side of the ceiling. If an attic is above ceiling

level, firestop spacer must be installed on top

side of ceiling joist (Figure 20).

Firestop Spacer

F8FS-2

Room Above

Figure 20

Figure 19

Firestop Thimble

FM8-AT2

Attic Above

2”

Clearance

Minimum

Figure 21

Ensure the thimble penetrates the roof opening.

The thimble must extend completely through the

ceiling or roof cavity to the outermost plane of

the roof. Note: Thimble extensions (F8-TE26-2)

are available from your dealer for constructions

in which the distance between the outside of the

roof and the inside of the ceiling exceeds 13".

The thimbles and their extensions provide for

zero clearances to combustibles and must be

used at the ceiling/roof in manufactured homes

(Figures 22 and 23).

Figure 22

Note: Trim Thimble/

Extension To Desired Length

And Pitch At The Rood Line

14" Min.

Pitched Roof

Pitched Roof

Bow Roof

14" Min.

Outer Pipe Of

Chimney

Outer Pipe Of

Chimney

Outer Pipe Of

Chimney

14" Min.

Thimble

FM8-AT2

13"

Thimble

FM8-AT2

Thimble

FM8-AT2

Thimble

Extension

F8-TE26-2

warnInG

do not allow insulating materials to

be blown into the space inside the

thimble and the chimney. To do so

could result in a fire hazard.

Thimble Cathedral

Ceiling

14" Min.

Outer Pipe Of

Chimney

Use Adjustable Thimble

FM8-AT2 For All Ceiling

Piches, From Flat To

3/12 Pitch.

Figure 23

step 4. Note: Chimney sections are con-

structed with a unique locking tab

design, which ensures an immediate,

tight assembly between sections. Plan

your chimney requirements carefully

before assembly as chimney is difficult

to disassemble after installation. If

disassembled, the tabs might become

damaged. Be certain tabs are properly

formed to ensure locking tabs engage

properly.

The Security Chimneys FTF8 chimney system

is a two piece chimney, which snap together

from the fireplace up. Start with the inner flue

section with the lanced end up, snap lock it in

to the matching collar on top of the fireplace.

At all subsequent joints, the upper flue section

fits into the preceding flue section. Each piece

snaps together by means of locking tabs (9

locking tabs per joint). Check each piece by

pulling up slightly from the top to ensure proper

engagement before installing the next section.

If the flue has been installed correctly, it will not

separate when you test it. Also, the inner flue

joint where each section is joined should be

tight and flat without gaps (Figure 24).

Figure 24

Outer pipe section installs in just the opposite

way; the lanced end goes down and each new

section goes OVER the outside of the previous

section installed (Figure 25).