4300 Series Ancillary Cabinets Installation and Operation Manual

8.1 Unpacking

Unpack the UPS indoors on a paved floor. The UPS should be as close as possible to its final storage

location. Allow enough space for forklift operations to unpack the UPS crate. Then remove the crate.
Points to observe

Retain all small articles during unpacking and installation.

Make sure that exterior paint is not scratched and that the UPS cabinet is not damaged.

DO NOT damage the UPS when using tools to remove packaging materials.

If provided, DO NOT remove the plastic sheet cover, until installation.

Do not remove the fan covers until UPS start up. The fan covers should be removed by factory

authorized personnel. Packing materials should be disposed by the appropriate means.

Immediately report any abnormalities to Toshiba Customer Support Center or an authorized

representative.

8.2 UPS Clearance

Maintain the indicated clearance during installation. See Figure 8.1. Ensure that the front and top air vents

are NOT blocked.

FIGURE 8.1 - UPS CLEARANCE

Back 0 in. (0 mm)

Front

23 in.

(584 mm)

Top 12 in. (305 mm)