Control sequence of operation – Trane CVHE-SVU01E-ENX39640712050 User Manual

Page 66

Advertising
background image

CVHE-SVU01E-EN

66

Interval

Minimum

Maximum

Units

Actual Design

A. (Test for transition complete
input open)

160 to 240 milliseconds

B. (Just delay time)

20 milliseconds

C. (Close 1M (2K1) Contactor and test
for no current.) (Starter integrity test)

500 milliseconds

D. (Hold 1M (2K1) Contactor and test
for no current.) (Starter integrity test)

1 second

E. (Open 1M (2K1) Delay time

200 milliseconds

F. (Close Shorting Contactor (2K3) and
and test for no current, then wait for
Start command.) (Starter integrity test)

100

milliseconds

1 second (Minimum)

G. (Close 1M (2K1)

2.0

second

2 second

H. (Wait 1.5 seconds after phase currents
drop to 85 percent)

1

2

second

1.5 second

J. (Begin Transition sequence)

85

100

milliseconds

100 milliseconds

K. (Open S (Shorting) Contactor)

250

300

milliseconds

260 milliseconds

L. (Close 2M (2K2) Contactor

140 milliseconds

M. (Wait to look for Transition complete)

milliseconds

2.32 to 2.38 second

N. (Filtering time on Transition
complete input)

milliseconds

160 to 240 milliseconds

Figure 24. Test and start timing sequence

Timing requirements to operate the
“Stop”, “Start”, “Short”,
“Transition”, and “Run” contact
closure outputs are shown below.
Prior to closing the “Short” contact,
the transition complete input shall be
verified to be open, otherwise an
MMR diagnostic shall be generated.

Control Sequence
of Operation

Steps A to F: Starter Integrity Test.
Steps F to N: Starter Timing