Turbo control system preparation, Install control-unit harness – TOYOTA pmn User Manual

Page 42

Advertising
background image

42

12. Turbo control system preparation

1. TURBO CONTROL SYSTEM PREPARATION.

(a) Install the power control-unit onto the bracket using

the 2 bolts and 2 nuts.
K: Bolt (2 pcs.) (24-2)
K: Control-unit (23-4)
K: Power Control-unit bracket (24-3)
K: Nut (2 pcs.) (24-7)
Torque: 8 Nm

(b) Install the relays onto the bracket using 2 bolts and 2

nuts.
K: Relay (2pcs.) (23-5)
K: Bolt (2 pcs.) (24-9)
K: Nuts (2 pcs.) (24-6)
Torque: 6 Nm

2. INSTALL CONTROL-UNIT HARNESS.

(a) Install the control-unit harness into the control-unit

with the 2 connectors.
K: Control-unit wiring harness No.1 (23-1)

(b) Install the relay connectors into the relays.

K

K

K

K

K

K

K

K

K

K

K

K

K

Advertising