ASSEMBLY

Assembly Section 2-13

*NOTE ON HUSCO CONTROL VALVES*

Manual, cable controlled (Husco control valve) boom mowers require check valves

with integral restricting orifice (#06502036) installed in the control valve work ports that
are connected to the gland ends of the main and secondary boom cylinders. This check
valve allows oil to free flow into the gland end of the main and secondary boom cylinders,
but restricts flow out of the cylinder, thereby providing proper boom control. This check
valve, #06502036(Vendor #1968R-.063) is similar in appearance to hose adapter #33271
and Adapter #34396, with.06 orifice. These components can be identified as follows, and
are to be installed per parts section for the lift valve.

(ASM-HUSCO-0001)

HOSE AND WIRE ROUTING

Attach two clamps to the right rear wheel well for proper hose/wire routing. Drill

one hole for each clamp. Use the lower rear corner of the wheel well as an origin for
measuring. The holes should be 10mm or 3/8” reamed to accept 3/8” hardware.
Measure along the back edge of the wheel well 6” from the origin. Use a square to
measure 2-½” up, from the last mark. Refer to the image below to see the first hole.
The second hole should run parallel to the bottom edge of the wheel well. Mark
the hole 22” from the origin and 3-½” from the bottom edge. Use the images below
for reference.
NOTE: DO NOT CUT INTO TUBES / HOSES / WIRES WHEN DRILLING