Operation, Opera tion – Tiger Products Co., Ltd JOHN DEERE 5101E User Manual

Page 70

Advertising
background image

OPERATION

Side and Rear Flail

Operation Section 3-18

© 2012 Alamo Group Inc.

OPERA

TION

Flail Mower PRE-OPERATION Inspection

Mower ID#________________

Make ____________________

Date: ________________

Shift

____________________

Before conducting the inspection, make sure the tractor engine is off, all rotation
has stopped and the tractor is in park with the parking brake engaged. Make sure
the mower is resting on the ground or securely blocked up a nd all hydraulic
pressure has been relieved.

Operator’s Signature:

Table 1:

Item

Condition at

Start of Shift

Specific Comments if

not O.K.

The Operator’s Manual is in the canister
All safety decals are in place and legible
The Mounting frame bolts are in place and tight
The connection bolts & pins are tight
There are no cracks in mower
The Hydraulic Cylinders pins are tight
The Hydraulic Pump hose connections are tight
The Hydraulic Valve hose connections are tight
The Hydraulic Valve controls function properly
There are no leaking or damaged hoses
The Hydraulic Oil level is full
There is no evidence of Hydraulic leaks
The Blades are not chipped, cracked or bent
The Blade bolts are tight
The Deflectors are in place and in good condition
The shields are in place and in good condition
The Skid shoes are in good condition & tight
The Hyd. motor mounting bolts are tight

DO NOT OPERATE an UNSAFE TRACTOR or BOOM

Advertising
This manual is related to the following products: