2 powering the system on and off, 1 powering on, Powering the system on and off – Accusys ExaSAN SW16 User Manual

Page 37: Powering on, Figure 23: power on sequence

Advertising
background image

3. Installation

User Guide

Page 3-6

SW16 will beep unless both power cords are plugged in.

3.2 Powering the System On and Off

3.2.1 Powering On

Before powering on, make sure that all cables and cords are properly installed and

connected.

1. Press the power button on the rear panel of storage first. Wait until all the LEDs on the

left handle turn blue, then,

Turn power on for the ExaSAN SW16 by switching on the Power button. Wait for the

“Link LED indicator” (refer to Section 1.4.1.1, “SW16 Front Panel”) to turn into a solid

blue state. Soon thereafter, you will hear 3 beeps signifying that the clients can now

be powered on. You might hear other beeps, but the 3 beeps are significant,

indicating that it has fully booted up.

3. Turn on clients, MDC first (for non-SW16 ExaSAN switches), then the remaining client

workstations.

Figure 23: power on sequence

Caution

It is important to follow the correct Power On sequence. Failure

to do so may result in some features not functioning properly.

Advertising